Technical Assistance for the Construction Supervision of Tranche 3 Lanjik-Gyumri Road Section

Sector

Transport and Road Infrastructure / Civil Engineering

Country

Armenia

Period

08/2015 – 12/2018

Donor

Ministry of Transport and Communication of the Republic of Armenia

Amount

Contract value: 3,365,590 EUR – OPC share: 772,000 EUR

Background and Objectives

This project provides technical assistance for the construction supervision of the Lanjik-Gyumri road section (approximately 27.47 km) of the North-South Corridor. The objective is to ensure that construction works are executed in accordance with FIDIC conditions, with high quality, safety, and timely completion.

Activities

  • On-site technical and administrative supervision during construction.
  • Evaluation of contractor performance and management of payment certifications.
  • Coordination of engineering testing and quality control activities.
  • Preparation of progress reports and technical documentation.

Results

  • Successful completion of the road section in full compliance with technical and safety standards.
  • Prompt resolution of any construction issues through effective supervision.
  • Delivery of a road section that meets high-quality and contractual requirements.

Related references

Armenia

Supervision Of Tranche 3 and Feasibility, Preliminary & Detailed Design for Tranche 3 and 4 of the North-South Road Corridor

Transport and Road Infrastructures
Moldova

Supervision of Civil Works for the Rehabilitation on R1 Chisinau-Ungheni-Sculeni Road

Transport and Road Infrastructures
Moldova

Supervision of Civil Works for the Rehabilitation on R33 Hincesti-Lapusna-M1 Road

Transport and Road Infrastructures
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.